General celebration resulted as the dust wall gradually came down this week. The frame is left but all the drywall and insulation has been removed.
It is exciting to see the other half of the Atrium again, complete with different levels of bridges and ramps. It is also nice to be able to see the construction crew at work again.
The third floor bridge has been enlarged so as to provide a seating area and gallery space for some of Grebel's artwork.
The sightline extends under the third floor bridge through the Paetkau seminar room to the glass windows facing onto Westmount road.
See Grebel's Facebook page for a collection of pictures from the new addition - many of the walls are painted and carpet and tile are installed, which makes it look very nearly done! https://www.facebook.com/media/set/?set=a.10152175142838826.1073741841.52568968825&type=1